Find Substation Structure, Substation Framework, Substation Steel Structure on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Substation Structure > 110kv Hot DIP Galvanized Substation Structure Steel Pole

110kv Hot DIP Galvanized Substation Structure Steel Pole

Basic Info

Model No.:  Q235

Product Description

Model NO.: Q235 Conductor Circuit: Single Circuit Materials: Steel Style: Pole Material: Steel Treatment: Hot-DIP Galvanization Galvanizing: ASTM A123 Yield Stress: 355 MPa Trademark: JSBS Origin: Yixing, Jiangsu Usage: Tension Tower, Angle Tower, Terminal Tower Certification: ISO, RoHS, Ma;SGS;Ohsas Standard: Nonstandard Structure: B Type Shape: Octagonal Welding: Aws D1.1 Min Thick: 3.0mm Install: Burial Specification: ISO9001: 2008 HS Code: 73269090 Factory Profile
Founded in 2005, Jiangsu Bosheng Steel Poles Co.,Ltd located in Heqiao Town Industrial Zone, Yixing District, Wuxi City, Jiangsu Province, China.

Bosheng is the specialized manufacturer of various steel poles and steel components including street lighting poles, electric power poles, traffic signal poles, flag poles, wind power poles and microwave communication towers, etc.

Through Shanghai Port, which is one of the largest ports in China, we export poles to South America, Middle East, Africa, Australia, Philippines and other countries.
110kv Hot DIP Galvanized Substation Structure Steel Pole
 
Product Show
110kv Hot DIP Galvanized Substation Structure Steel Pole                          

Manufacturing Process
Our factory owns advanced production lines and machines including bending calibration machine, hydraulic plate shears machine, shears machine, slitting machine, 208T hydraulic straightener, etc. All the purpose is to produce good quality steel poles.

The fabrication process as cutting plate, bending, forming, automatic welding, drill holes, quality checked before galvanized, hot dip galvanized and powder coating, finally quality checked according to client's requirements.
110kv Hot DIP Galvanized Substation Structure Steel Pole

Inspection
To ensure the quality, we have professional technicians to check the pole during the manufacturing and before delivery.
110kv Hot DIP Galvanized Substation Structure Steel PoleGalvanization Thickness Test

110kv Hot DIP Galvanized Substation Structure Steel Pole
Lab Test

110kv Hot DIP Galvanized Substation Structure Steel Pole
 Load Test

FAQ:
1. Port of Loading: Shanghai, China or as request
2. Price term: EXW,FOB,CFR, CIF.
3. Payment Term: 30%TT in deposit, 70%TT before shipment.  Or LC.
4. Delivery: Based on your order quantity. Normally 15 days after receiving your deposit.

Contact us if you need more details on Pole. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Steel Pole、Substation. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Substation Structure

Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters